Michael Mioux - Week Two Lessons Learned

Working two days this week was a little more manageable. Because of taking Labor Day off, I tried making some hours up by working a full...

Michael Mioux - Week One Lessons Learned

Michael Mioux – Week One Lessons Learned It’s always a little difficult to start a new job. Usually there’s a lot of time spent training...

Tyler McKenzie - Week 5

My biggest take away from this week is that for an architecture firm to thrive a good and efficient billing system must be in place....

Ailed Mazas - Week 4 Lessons learned

It has been challenging to produce an accurate model of an existing building that has experienced several additions through out the...

Ailed Mazas- Week 3 Lessons Learned

From this week the biggest lesson came from a very short meeting at the city of Charleston. It was very educational to see how in this...

Julian Owens - Week 5

The more chances I get to work in the metal shop, the more I learn just how much I love cutting and manipulating steel. Just the...

Julian Owens - Week 4

I learned this week that collaborating in the real world can be just as frustrating as collaborating in studio or research methods or any...

Julian Owens - Week 3

I worked just one day this week because of my slightly irrational fear of Hurricane Irma. I did get a chance to see Meadors' preparation...

Julian Owens - Week 2

This week I learned what a springhouse is. It's a small building situated over a spring and used for cool storage. I looked at 100s of...

Julian Owens - Week 1

This week, along with last week, I learned just how time consuming CD sets are, even for the tiniest projects they can be 50 pages long....

Week 4: Lessons Learned

A lesson I learned this week was the importance of double and triple checking that you have a "watertight" and solid mass for sending a...

Week 3: Lessons Learned

A lesson from this week is the importance of being abundantly clear on construction documents. Just because it is easy to follow the...

Week 2: Lessons Learned

The attached image is of a drying shed, a structure used as one of the design precedents for the commercial building envelope project in...

Week 1: Lessons Learned

One week in the books. A big lesson I learned this week was how important cognizance of historical context is in design and construction...

Ailed Mazas - Week 2 Lessons Learned

Because projects can not wait for the survey to start the design of additions and modifications, when this finally arrive there are...

Ailed Mazas - Week 1Lessons Learned

This week I understood why in firms drawings sets are passed around the office to be checked by several people. Red lines are a big thing...

Lessons Learned - Week 3

I learned how important site context and the right view is to showing exactly what we want to show to a client. A little to the left, a...

Tyler McKenzie - Week 4

This week I learned how important it is to understand a place before jumping straight into designing. By sitting down and talking with my...

Tyler McKenzie - Week 3

This week I learned about some of the other tasks that come with owning an architecture firm such as preparing for a hurricane. Though...

Tyler McKenzie - Week 2

Through sitting in on some meetings this week I learned how much coordination it takes between architects and consultants on even the...