Day 41: 11.14.2017
5.5 HOURS: Continued working on NCHS reprogramming/renovation study. Adjusted graphics of floor plan drawings, changed furniture options....
5.5 HOURS: Continued working on NCHS reprogramming/renovation study. Adjusted graphics of floor plan drawings, changed furniture options....
4.5 HOURS: Began writing a project narrative and project description for the NCHS study. This narrative will be used by the client for...
3.0 HOURS: Prepared a set of documents for a meeting regarding the Meeting Street restaurant project. Attended meeting with mentor,...
4.0 HOURS: Continued working on NCHS re-programming/renovation project. Made necessary adjustments to overall site drawing which includes...
5.5 HOURS: Continued working on the study for the renovation and reprogramming of the North Charleston High School front entry. Made...
4.5 HOURS: Adjusted some of the Revit lighting families that I modeled earlier. Modeled the bar for the Meeting Street restaurant in 3D....
Hours worked: 4.25 hours Tasks performed: AutoCAD Work accomplished: I Created a metal railing option for the Pinckney Residence which...
5.0 HOURS: Assisted interiors team in modeling Revit families of lighting fixtures for Meeting Street Restaurant project renderings....
3.5 HOURS: Assisted on the creation of a study for a large warehouse structure in North Charleston. Various programmatic layouts are...
4.0 HOURS: Continued working on BAR-S submittal for Meeting Street restaurant project. Arranged photos of existing structure, annotated...
4.5 HOURS: Began to prepare BAR submittal for Meeting Street restaurant project. Because of its size, it falls under the BAR-S. This...
Hours worked: 4 hours Tasks performed: AutoCAD Work accomplished: Continued to make the floor plan and elevation for the facade of the...
Hours worked: 4 Tasks completed: Spoke with my mentor Kate regarding prompt #2, selecting the question, "how you build an architectural...
Hours worked: 4 Tasks completed: Continued on interior elevations for a private residence in Mount Pleasant, SC. Kate gave me redlines...
Friday, Nov 17, 2017 Duration: 4.25 hours. A major part of today was spent in a long meeting with the builders of the Stonoview project...
Thursday, Nov 16, 2017 Duration: 3.5 hours. I did some code research about energy use and parking requirements for Dr Horton's Avalon...
Wednesday, Nov 15, 2017 Duration: 4 hours. We demolished our way through the ceiling to see the structure holding up the roof of a...
2.0 HOURS: Continued on preliminary design work and research for high-end restaurant on Meeting Street. AXP: PP&D/P&A
5.0 HOURS: Finished working on perimeter floor plans for The Jasper. Continued working on preliminary design and programming layout...
Hours worked: 4 Tasks completed: Completed a marketing RFQ request for qualifications that I started yesterday with Beau and Kate's...