Duration: 4.25 hours.


A major part of today was spent in a long meeting with the builders of the Stonoview project about the constructability of some details in our drawings. The intention is to make the drawings as "dummy-proof" as possible. I then helped Luke draft an email with the technical summary of everything discussed during the meeting. I also helped Jonathan finish the existing elevations of 81 Nassau St.


Tasks completed: client meeting, draft email with technical summary, elevations

AXP credits: TBD


Project: Stonoview Amenity Center

Location: Charleston, SC

Type: residential community

Phase: design


Project: Foundry Alley 81 Nassau St

Location: 81 Nassau St, Charleston, SC

Type: residential

Phase: design


The highlighted areas show details on the patina of the building. I also added other details like window light patterns, pipes on the exterior, board hatches etc. (81 Nassau St.)It is nice to see this project go from site sketches and measurements to actual drawings. I'm excited to see what the final renovations will look like.

Recent Posts

See All
Michael Mioux - Day 35

Hours worked: 4.5 Tasks performed: Revit Work accomplished: Kept adding windows to Sedgefield, adjusted dimensions of walls to make more...

 
 
 
Michael Mioux - Day 34

Hours worked: 6.25 Tasks performed: Revit Work accomplished: Finished placing the walls in Sedgefield school. Started adding windows in...

 
 
 
Michael Mioux - Day 33

Hours worked: 5.5 Tasks performed: Revit and walkthrough Work accomplished: Created more walls for Sedgefield school (there’s a lot)....

 
 
 

Comments


bottom of page