VISHNU — DAY 50

  • Nov 17, 2017
  • 1 min read

Updated: Nov 19, 2017

Wednesday, Nov 15, 2017

Duration: 4 hours.


We demolished our way through the ceiling to see the structure holding up the roof of a historic Charleston Single house. Sometimes the only way to figure out what we can change is to actually go out there and smash through ceilings. Today we discovered that a part of the structure was added on at a later point, and this will likely affect the design interventions that we propose.

Once I'm back I worked on adding more details to the elevation drawings.


Tasks completed: on-site demolition and investigations, elevations

AXP credits: TBD

Project: Foundry Alley 81 Nassau St

Location: 81 Nassau St, Charleston, SC

Type: residential

Phase: design


Breaking through ceilings just to see the roof structure: Jonathan shows me how it's done.


"Just as we suspected", says Jonathan.


"This structure was definitely added at a later point."

Recent Posts

See All
Michael Mioux - Day 35

Hours worked: 4.5 Tasks performed: Revit Work accomplished: Kept adding windows to Sedgefield, adjusted dimensions of walls to make more...

 
 
 
Michael Mioux - Day 34

Hours worked: 6.25 Tasks performed: Revit Work accomplished: Finished placing the walls in Sedgefield school. Started adding windows in...

 
 
 
Michael Mioux - Day 33

Hours worked: 5.5 Tasks performed: Revit and walkthrough Work accomplished: Created more walls for Sedgefield school (there’s a lot)....

 
 
 

Comments


bottom of page