Oct 15, 20171 min read
VISHNU — DAY 23
Hours worked: 3 Another day, another project: DR Horton — Cypress Ridge I add revision clouds, some notes, ADA clearance boxes around the...
Hours worked: 3 Another day, another project: DR Horton — Cypress Ridge I add revision clouds, some notes, ADA clearance boxes around the...
Hours worked: 3.5 I draw the proposed roof plan. I figure out the new slope of the roof based on the changes and I update the roof...
Hours worked: 3.5 663 Blvd. has been put on hold for now, and I get to work on a new project: 371 Red Bay on Kiawah Island. I figure out...
Hours worked: 3.5 I spend about 1.5 hours doing white out corrections on printed drawing sets of Foundry Alley. They had forgotten to...
Hours worked: 3.5 Week 5 begins. More red lines. I drive to A&E again to get Miao's renderings scanned. We have a meeting to discuss...
Hours worked: 3.5 We visit 205 St. Philip St. to take measurements of the two existing buildings. We briefly meet the clients on site....
Hours worked: 3.5 More red lines today. I don't really remember anything else. I must be in the zone. May it'll help if I live-blog this...
Hours worked: 3.5 I continue tracing elevations of 663 Blvd. Duplex and Triplex buildings. I get a short break and drive to A&E Digital...
Hours worked: 4 We have a long staff meeting to discuss tasks for the week. I trace elevations for 663 Blvd. Duplex and Triplex buildings...
Hours worked: 4 Week 4 begins. I work on window and door tags/schedules and red lines for Lots 8&9 of Foundry Alley. Tasks completed:...
Hours worked: 3.5 I work on window tags for Lots 3&4, window and door tags/schedules for Lots 8&9 of Foundry Alley. I also work on detail...
Hours worked: 4.5 A very short week 3 begins. I'm back after my short break in Clemson. I get started with aligning the SketchUp...
Hours worked: 3 I work on tags and schedules for windows and doors for Lots 3&4 of Foundry Alley. Swapping/remapping all the tags was a...
Hours worked: 3.5 I work on red lines of Foundry Alley (92 Nassau St) on sheets A-000 through E-102. We then walk to The Alley for lunch...
Hours worked: 3 I make PDFs of floor plans, extract elevations from SketchUp, update and make PDFs of elevation sheets of Sunspring 663...
Hours worked: 3.5 Week 2 begins. I update room tags, wall labels, and general notes in drawings of Foundry Alley (Lots 3&4). We then have...
Hours worked: 3 I add window and door tags to the plans, elevations, and work on the door schedule for Foundry Alley (84 Nassau St)....
Hours worked: 3 I eTransmit/PDF the drawing sheets of the Banyan Roots brewery. I meet Luke to discuss my updated goals before sending...
Hours worked: 4 I add updated SketchUp views to the DRC submission document for the Banyan Roots brewery. Following this I take notes...
Hours worked: 3 Synchronicity had gone through a re-branding effort last year, and the old CAD files need to updated with the new logo...