Wan Lam Ng - Week 9

  • Dec 14, 2017
  • 1 min read

This week we had a site visit for a current project that was the private pool club. We had to measure the existing buildings that near by the site and that was one of the requirement. I remember that day was rainy and cold, my mentor and I were holding the measuring tape and going to each building to measure the total length of the facades, the windows height, the door heights, and the distance between the windows and doors. There was one building that were locked at the front gate and my mentor had the code to unlock but it didn't work so we went through the tiny space between the gate. We didn't had floor plan for the existing building so I hand drew the plan and elevation on a note pad base on what I see. It was fun entire time and was a new experience for me.