top of page

Wan Lam Ng - Week 12

  • Dec 14, 2017
  • 1 min read

This week I was continued to work on the spread sheet for the construction document. I had learned that there were a lots of sheet included in that construction document set. It was still had lots of final works add to the set, lots of the drawings were still in concept drawing status. I was adding the foundation detail, wall detail to the sections and elevations and arranged the layout of different sheets. I enjoyed working on the construction document even they were not easy to do and required lots of detail and work, but it was fun to edit the drawings.

Recent Posts

See All

Comments


bottom of page