VISHNU — DAY 30
- Oct 15, 2017
- 1 min read
Hours worked: 3.5
Today I work on mirroring a whole building (162 Spring St.) to create drawing sheets for the adjacent proposal. I mirror the plans, elevations, section call-out directions, and the electricity, power and gas plans. The elevation names (direction) changes along the direction of mirroring. I also learned to make MTEXT justifications work while mirroring.
After I'm done, we get a lot of red lines on the original un-mirrored building, so the whole exercise was a great learning experience. (Don't mirror projects before you're sure of the original project.)
Tasks completed: make mirrored drawing sheets of the whole project
AXP credits: TBD
Project: Fish Hopkins - 162 Spring St.
Location: 162 Spring St, Charleston, SC
Type: residential
Phase: design revisions
[101]
Comments