Shane Lenard – Day Forty-Two
- Nov 9, 2017
- 1 min read
Date: 11/9/17
Hours: 3
AXP: Project Development and Documentation
Task Performed: CSL As-built 1841 Elmwood Ave. Buffalo NY and DRYVIT details
Work Accomplished: Today I finished CSL Buffalo. In addition to the things I changed yesterday, I added low walls, fixed the area plan lines, and re arranged the sheet so everything will fit at 1”=30’. I also took some liberties with regards to where walls needed to go which was a bit of a design challenge. I then worked on DRYVIT details for about an hour before the class meeting.