top of page

Rachel Smoak - Day 38

  • Nov 16, 2017
  • 1 min read

Hours: 4

Tasks: floor plan edits

AXP: Project development and documentation

Today I spent my time between the TCL floor plans and the Indigo Hall unit floor plans. There were new redline edits to be made to each of these projects. After looking at the TCL proposed floor plans there were changes we wanted to make to the doorways, alcoves, and details within the drawings including annotating the spaces. I then moved onto Indigo Hall, some of the doorways and alcoves were not the correct sizes for the needs of the residents so I made the required changes and added in the missing annotations for dimensions, elevations and materials.

Recent Posts

See All
Michael Mioux - Day 35

Hours worked: 4.5 Tasks performed: Revit Work accomplished: Kept adding windows to Sedgefield, adjusted dimensions of walls to make more...

 
 
 
Michael Mioux - Day 34

Hours worked: 6.25 Tasks performed: Revit Work accomplished: Finished placing the walls in Sedgefield school. Started adding windows in...

 
 
 
Michael Mioux - Day 33

Hours worked: 5.5 Tasks performed: Revit and walkthrough Work accomplished: Created more walls for Sedgefield school (there’s a lot)....

 
 
 

Comments


bottom of page