Rachel Smoak- Day 14

  • Sep 27, 2017
  • 1 min read

Hours: 4.25

Tasks: Elevation materials

AXP: Project Planning and Design

Today I spent the morning working with materials to be used on the exterior of an school the firm is designing. I worked with the combination of insulated metal panels and brick. The design is complex and requires a feeling of great depth into the spaces and how the buildings relate to each other. The division of materials within the elevation make for a dynamic facade.

Recent Posts

See All
Michael Mioux - Day 35

Hours worked: 4.5 Tasks performed: Revit Work accomplished: Kept adding windows to Sedgefield, adjusted dimensions of walls to make more...

 
 
 
Michael Mioux - Day 34

Hours worked: 6.25 Tasks performed: Revit Work accomplished: Finished placing the walls in Sedgefield school. Started adding windows in...

 
 
 
Michael Mioux - Day 33

Hours worked: 5.5 Tasks performed: Revit and walkthrough Work accomplished: Created more walls for Sedgefield school (there’s a lot)....

 
 
 