Julian Owens - Day 18

  • Sep 29, 2017
  • 1 min read

Hours: 4. Tasks: Create template for the location of holes to be drilled into the upper floor glass railing of a residential project. Cut eight 2' long steel rods to be used as stakes on site. Work Accomplished: All of the rods are cut, and the template is being passed along to the head of construction onsite. AXP: Construction and Evaluation